    Hi Guys,

    I have a Workbook with a Worksheet that contains a WatchList and a Chart. Now, I can Link them so that when I select a code on the Watchlist it is displayed on the Chart.

    However, if I change the Chart Period or the Watchlist Period in  either the Chart or the Watchlist, say from “2 Day” to “Month”, the corresponding Watchlist/Chart period does not change, it remains on its original setting, continuing the example: “1 Day”.

    20200315 Link Watchlist and Chart Periods

    Is there a way to link the Watchlist and Chart Periods?

    If not, then maybe you can add it to your To-Do-List so that the Watchlist and Chart match each other.

    Cheers

    Trevor

    #57371
    MathewMathew
    • Topics: 28
    • Replies: 1,442
    • Posts: 1,470

    Hi Trevor,

    There is no way to link the two time frames. I have to be honest and say that I can not see it getting done as it is not trivial and we have a lot of other projects which will have more impact.

    All the best

    Mathew

    #57375
    AvatarTrevor R
    • Topics: 91
    • Replies: 266
    • Posts: 357

    Hi Mathew,

    I suspected as much. One can only hope☺

    Cheers

    Trevor

Viewing 3 posts - 1 through 3 (of 3 total)
  • You must be logged in to reply to this topic.

Pin It on Pinterest

By continuing to use the site, you agree to the use of cookies. more information

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close